Project general facts Terra Tower is a contemporary 12-storey residential development offering a collection of studio, one-, two-, and three-bedroom apartments designed to accommodate a variety of lifestyles. The project combines modern architecture with thoughtfully planned residential layouts, creating comfortable and functional living spaces. Residences are designed with contemporary interiors, spacious layouts, and a focus on everyday practicality, while the overall architectural concept emphasizes elegance, quality, and long-term residential appeal. A key feature of the development is its panoramic rooftop terrace, which serves as an extension of the residential lifestyle experience. Residents have access to a range of amenities designed to support relaxation, recreation, and community living. The development features a panoramic terrace, communal leisure spaces, and residential facilities that contribute to a comfortable and balanced lifestyle. The amenity offering is designed to enhance everyday living while providing spaces for relaxation, social interaction, and enjoyment of the surrounding views. The residences feature modern finishing with high-quality materials throu
| Milestone | Share | On AED 1.39M |
|---|---|---|
| On booking | 10% | AED 139K |
| During construction | 30% | AED 417K |
| During 10 Yaers Post Handover | 60% | AED 833K |
| Milestone | When | Amount |
|---|---|---|
| Downpayment (10%) | On booking | AED 138,899 |
| During construction (30%) | ≈ AED 17,362 equivalent per month over 24 months | AED 416,696 |
| Post-handover (60%) | After you get the keys | AED 833,392 |
| DLD fee (4%) | On booking | AED 55,559 |
| Admin / Oqood (est.) | On booking | AED 5,250 |

Dugasta aims to become inseparable from notable ventures setting new norms for planning, craftsmanship, and propelling ways of life. With the current demand for high-quality projects in popular locations around the city of Dubai, Dugasta has a strong strategy, competence, financial strength, and is well-positioned to…
Terra Tower starts from AED 1.39M and runs to AED 2.58M, across 1 bedroom, 1 bedroom, 1 bedroom, 1 bedroom. Prices move with each release; the pack carries the current list.
10% on booking, 30% during construction, 60% during 10 yaers post handover, worked in dirhams on AED 1.39M in the table above. Every instalment is paid into the project’s regulator-controlled escrow account, with the 4% DLD fee on top at registration.
Dugasta lists handover for Q2 2026, with the project currently under construction. The project completion checker on this site carries the RERA-inspected percentage for Dubai projects, refreshed monthly, which is the number to read against that date.
In Dubailand Residence Complex, Dubai: Central Park 7.1 km, Downtown Dubai 19.7 km, Sufouh Beach 17.9 km. The Dubailand Residence Complex community guide on this site has the registered prices, rents and schools around it.
Yes, escrow account 019000084928. Payments release to the developer only against certified construction progress.
4% DLD registration fee, admin/registration fees, and our brokerage fee is paid by the developer. You pay no commission buying off-plan through Equity Edge.